In very broad terms, the word ‘commencement’ means beginning something. In the construction industry this generally refers to the contractor beginning the construction works, ie the point at which site clearance, demolition, excavation or construction begins. For more information see: Construction operations definition.
Commencement of construction works will be proceeded by activities such as design, procurement and mobilisation, and there may be legal requirements that need to be satisfied, such as obtaining planning permission, satisfying planning conditions or planning obligations, obtaining building regulations approval, obtaining a party wall agreement, notifying the Health and Safety Executive and so on. For more information see: What approvals are needed before construction begins.
In addition, commencement may be required before a certain point, for example, within 3 years of the date planning permission was granted, or within three years from the date of deposit of plans for building regulations approval.
Commencement may also have contractual implications, as the date for possession of the site by the contractor may be set out in the contract. If the client fails to give possession of the site to the contractor, and there are no provisions for delay in the contract, then they will be in breach of contract. Even if the contract does provide for delay in giving possession of the site to the contractor, the contractor may still be able to claim for an extension of time and perhaps loss and expense.
If no date for possession is included in the contract, then the site must be handed over to the contractor within a reasonable time after signing of the contract.
On commencement of the works, the contractor may become responsible for insurance, security of the site and so on, and may be obliged to progress regularly and diligently with the works, or to achieve certain key dates.
The term ‘commencement’ might also be used to refer to the commencement of an appointment, the commencement of a contract, commencement of legal proceedings and so on.
[edit] Related articles on Designing Buildings
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.